Implementation of the Meybod project

cast iron line

  • Bending and cutting operation of rebar for the implementation of the wall of 3 basins of line 400 cast iron
  • The operation of reinforcing the wall of 3 basins of line 400 cast iron in the mileage of 04+866, 04+725 and 05+600
  • Preparation and discharge of 240 pieces of foam in the workshop
  • Preparation and discharge of 6 tees of 350 in the workshop

Polyethylene line
  • Bending and cutting operation of rebar to implement the wall of 3 ponds
  • Roof molding operation of regional water emergency well No. 1
  • Completion of the construction of the roof of the emergency well No. 2 of ABFA
  • The operation of installing well columns in Roknabad
  • Installation operation of emergency well column No. 1 of ABFA
  • The operation of installing the roof beams of the emergency well No. 2 of ABFA
  • Preparation and discharge of 6 tees of 350 in the workshop