Executive operations of Imam Port project

  • The operation of installing protection related to the pon
  • Repairing the brick facade of the diesel room and guard room
  • Construction of electrical panels related to pumps (80% physical progress)
  • Provision of a 1.5 ton garbage collection crane and unloading at the project site
  • Output line sounding operation