cast iron line
- Bending and cutting operation of rebar for the implementation of the wall of 3 basins of line 400 cast iron
- The operation of reinforcing the wall of 3 basins of line 400 cast iron in the mileage of 04+866, 04+725 and 05+600
- Preparation and discharge of 240 pieces of foam in the workshop
- Preparation and discharge of 6 tees of 350 in the workshop
Polyethylene line
- Bending and cutting operation of rebar to implement the wall of 3 ponds
- Roof molding operation of regional water emergency well No. 1
- Completion of the construction of the roof of the emergency well No. 2 of ABFA
- The operation of installing well columns in Roknabad
- Installation operation of emergency well column No. 1 of ABFA
- The operation of installing the roof beams of the emergency well No. 2 of ABFA
- Preparation and discharge of 6 tees of 350 in the workshop