- Completing the skeleton and concrete roof of 7 well-head construction chambers
- Completion of foundation and wall concreting operations of 22 cast iron and polyethylene ponds
- Completion of the surrounding walls of 3 chambers of the Sarchahi building and the completion of the shelter of one chamber
- Installation of fittings and valves for 12 polyethylene and cast iron basins
- Completion of drilling and piping operations of 400 mm cast iron line with a total area of 3200 meters
- Completion of the joinery (plaster) of the ceiling of Sarchahi building chambers 1 to 6