The progress of the water transmission line project from the existing wells to the 10,000 cubic meter reservoir in the city of Meybod

  • Completing the skeleton and concrete roof of 7 well-head construction chambers
  • Completion of foundation and wall concreting operations of 22 cast iron and polyethylene ponds
  • Completion of the surrounding walls of 3 chambers of the Sarchahi building and the completion of the shelter of one chamber
  • Installation of fittings and valves for 12 polyethylene and cast iron basins
  • Completion of drilling and piping operations of 400 mm cast iron line with a total area of ​​3200 meters
  • Completion of the joinery (plaster) of the ceiling of Sarchahi building chambers 1 to 6