Description of the progress of construction activities of the GRP water transmission line project of Saba Steel Company of the Persian Gulf

  • Surveying operations from km 000+00 to 252+01 (entire route)
  • Drilling operations for the entire route
  • Leveling and regulating the canal floor (entire route)
  • Installation of 600 mm GRP pipe from km 000+00 to 252+01 (entire route)
  • Drilling and implementation of 168 m long steel CASING
  • Backfilling on GRP pipes from km 00+0 to 252+01
  • Construction of 5 ponds out of a total of 5 ponds