Implementation of the water transmission line from Nimrod Dam to Firouz Koh Industrial Estate 1 and 2
Subject:
Implementation of water transmission line with fiberglass pipes with a diameter of 400 mm, installation of related valves and construction of concrete basins for valves and related operations.
Purpose:
water transfer and water supply from Nimrod dam to Firouz Koh industrial town
Employer:
Industrial Towns Company of Tehran Province
Consultant:
Reshab Design Consulting Engineers
Monitoring device:
Paul Road Consulting Engineers
Contractor:
Hamon Pipeline Development Company
Contract period:
12 months