Hormozgan


 

Project: Construction of a drinking water transfer pipeline from a 1000-cubic-meter water desalination plant to the Damahi water tanks of Bandar Abbas with a length of 33 kilometers.

 

Scope of work: Construction of water pipeline including operation with a length of 33 kilometers of 1200 mm steel pipes, all connecting and control components, implementation of a cathodic protection system, procurement of all the materials and installation of pipe protection covers in addition to construction of valve chambers, with reinforced concrete, and the access roads for equipment and machineries.

Client : Hormozgan Province Water and Sewerage Company

Consultant and Supervisor: Padid Ab Sepahan Consulting Engineers Company

Contractor: Hamoon Pipeline Development Company (Hapico)

Duration of Contract: 24 months