Report on the implementation of drinking water transfer project to the 10,000 cubic meter reservoir of Meybod city

1) Completing the walls of 5 chambers of Sarchahi building
2) Completion of 400 cast iron piping lines with a total area of ​​3640 meters
3) Execution of roof joinery of 7 chambers of Sarchahi building (plaster and whitewash)
4) Concreting the foundation and wall of 25 cast iron and polyethylene ponds
5) Installation of about 80% of cast iron and polyethylene valves and fittings
6) Construction and installation of steel doors and windows of two chambers in Sarchahi building
7) Installing well connections and connecting 3 wells to the transmission line to the tank
8) Washing and operation of the line from 800 to 6300 kilometers and connecting to the existing 600 cast iron line