{"id":10162,"date":"2026-06-21T11:05:15","date_gmt":"2026-06-21T11:05:15","guid":{"rendered":"https:\/\/hapico.ir\/en\/?p=10162"},"modified":"2026-06-21T12:57:33","modified_gmt":"2026-06-21T12:57:33","slug":"description-construction-works-of-the-bushehr-southeastern-wastewater-project-tangak-areas","status":"publish","type":"post","link":"https:\/\/hapico.ir\/en\/uncategorized\/description-construction-works-of-the-bushehr-southeastern-wastewater-project-tangak-areas\/","title":{"rendered":"Description Construction Works of the Bushehr Southeastern Wastewater Project (Tangak Areas)"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column]<div id=\"cz_82950\" class=\"cz_grid_p cz_82950\"><div class=\"cz_grid cz_grid_1 clr cz_metro_1 cz_grid_c4 cz_grid_1_no_title cz_grid_1_mid tac\"><div class=\"cz_grid_item cz_grid_first\"><\/div><div class=\"cz_grid_item \"><div><a class=\"cz_grid_link \" href=\"https:\/\/hapico.ir\/en\/wp-content\/uploads\/2026\/06\/photo1782026462.jpeg\" data-xtra-lightbox><img decoding=\"async\" width=\"600\" height=\"600\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D&#39;http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg&#39;%20width=&#39;600&#39;%20height=&#39;600&#39;%20viewBox%3D&#39;0%200%20600%20600&#39;%2F%3E\" data-czlz data-src=\"https:\/\/hapico.ir\/en\/wp-content\/uploads\/2026\/06\/photo1782026462-600x600.jpeg\" class=\"attachment-codevz_600_600\" alt=\"\" title=\"photo1782026462\" data-srcset=\"https:\/\/hapico.ir\/en\/wp-content\/uploads\/2026\/06\/photo1782026462-600x600.jpeg 600w, https:\/\/hapico.ir\/en\/wp-content\/uploads\/2026\/06\/photo1782026462-150x150.jpeg 150w, https:\/\/hapico.ir\/en\/wp-content\/uploads\/2026\/06\/photo1782026462-100x100.jpeg 100w\" data-sizes=\"(max-width: 600px) 100vw, 600px\" \/><div class=\"cz_grid_details\"><i class=\"fa fa-search cz_grid_icon\"><\/i><\/div><\/a><\/div><\/div><div class=\"cz_grid_item \"><div><a class=\"cz_grid_link \" href=\"https:\/\/hapico.ir\/en\/wp-content\/uploads\/2026\/06\/image19.jpg\" data-xtra-lightbox><img decoding=\"async\" width=\"600\" height=\"590\" src=\"data:image\/svg+xml,%3Csvg%20xmlns%3D&#39;http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg&#39;%20width=&#39;600&#39;%20height=&#39;590&#39;%20viewBox%3D&#39;0%200%20600%20590&#39;%2F%3E\" data-czlz data-src=\"https:\/\/hapico.ir\/en\/wp-content\/uploads\/2026\/06\/image19-600x590.jpg\" class=\"attachment-codevz_600_600\" alt=\"\" title=\"image19\" \/><div class=\"cz_grid_details\"><i class=\"fa fa-search cz_grid_icon\"><\/i><\/div><\/a><\/div><\/div><\/div><\/div>[vc_column_text]The project comprises three wastewater pumping stations located at different sites, a wastewater collection and conveyance network, gravity sewer transmission lines leading to the pumping stations, and pressurized transmission pipelines extending from the pumping stations to the Bushehr Wastewater Treatment Plant.<\/p>\n<p>To date, the concrete structure of the pumping station known as <strong>PS2<\/strong> has been constructed using the <strong>Top-Down construction method<\/strong>. In addition, the retaining structures for the underground pumping stations <strong>&#8220;B&#8221;<\/strong> and <strong>&#8220;G&#8221;<\/strong> have been completed following the execution of more than <strong>400 Deep Soil Mixing (DSM) columns<\/strong>.<\/p>\n<p>Furthermore, approximately <strong>20 kilometers<\/strong> of the wastewater collection network have been installed, along with more than <strong>10,800 meters<\/strong> of underground <strong>GRP pressurized transmission pipelines<\/strong> with diameters of <strong>700 mm and 1,000 mm<\/strong>.<\/p>\n<p>The overall physical progress of the project is currently estimated at <strong>39.3%<\/strong>.<\/p>\n<p>To date, nearly <strong>30,000 direct labor man-hours<\/strong> have been expended on the execution of the project.<\/p>\n<p>Approximately <strong>70% of the project-specific equipment and materials<\/strong>\u2014including various pumps, valves, pipelines, screening equipment, control panels, instrumentation devices, and related components\u2014have been procured and delivered to the project site.<\/p>\n<p>It is anticipated that the remaining works will be completed and the project will be commissioned within the next <strong>18 months<\/strong>.[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text]The project comprises three wastewater pumping stations located at different sites, a wastewater collection and conveyance network, gravity sewer transmission lines leading to the pumping stations, and pressurized &#8230; <a class=\"cz_readmore\" href=\"https:\/\/hapico.ir\/en\/uncategorized\/description-construction-works-of-the-bushehr-southeastern-wastewater-project-tangak-areas\/\"><i class=\"fa fa-angle-right\"><\/i><span>Read More<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":10165,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[17,1],"tags":[],"class_list":["post-10162","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/hapico.ir\/en\/wp-json\/wp\/v2\/posts\/10162","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hapico.ir\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hapico.ir\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hapico.ir\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/hapico.ir\/en\/wp-json\/wp\/v2\/comments?post=10162"}],"version-history":[{"count":5,"href":"https:\/\/hapico.ir\/en\/wp-json\/wp\/v2\/posts\/10162\/revisions"}],"predecessor-version":[{"id":10173,"href":"https:\/\/hapico.ir\/en\/wp-json\/wp\/v2\/posts\/10162\/revisions\/10173"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hapico.ir\/en\/wp-json\/wp\/v2\/media\/10165"}],"wp:attachment":[{"href":"https:\/\/hapico.ir\/en\/wp-json\/wp\/v2\/media?parent=10162"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hapico.ir\/en\/wp-json\/wp\/v2\/categories?post=10162"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hapico.ir\/en\/wp-json\/wp\/v2\/tags?post=10162"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}